Based on the time schedule, installation of steel structures, which is one of the basic activities of construction, was started in reduction area in line with other civil operations progress.

The steel structure has about 18 meters height and 8200 t weight and should be strong enough for installation of ceiling cranes on it.  

Related content

Last news